How to Quote for Landscaping Work: Rates and Tips

How to Quote for Landscaping Work: Rates and Tips

how to quote for landscaping work UK

Knowing how to quote for landscaping work accurately is what separates profitable landscape projects from ones that run over budget. Landscaping quotes require site visit measurement, material quantity estimation, and clear specification to prevent scope disputes.


How to Quote for Landscaping Work: Types

Hard landscaping (patios, driveways, paths, walls): fixed price based on measured areas and specified materials. Always survey – ground conditions vary significantly.

Soft landscaping (planting, turfing, borders): fixed price for defined scope, or day rate where the scale isn’t fully known.

Garden clearance and maintenance: day rate or fixed price per visit.


Current UK Landscaping Rates 2026

Job typeTypical rate
Patio laying – Indian sandstone (per m²)£60-£90/m²
Patio laying – porcelain (per m²)£75-£110/m²
Block paving driveway (per m²)£70-£100/m²
Turfing (per m²)£8-£15/m²
Raised vegetable bed£200-£400 per bed
Garden clearance£150-£350 per day
Day rate£180-£300/day

Source: Checkatrade landscaping costs, 2026.


What a Landscaping Quote Should Include

A professional landscaping quote includes:

  1. Site address and survey date
  2. Scope of work – specific areas, materials specified by product name
  3. Ground preparation – excavation depth, sub-base type and depth
  4. Materials quantities – calculated from survey measurements
  5. Any drainage or levelling requirements
  6. Plant specifications (by name and size if relevant)
  7. Waste removal
  8. Labour and materials separated
  9. Provisional sums for unknowns (hidden service runs, unexpected ground conditions)
  10. Payment terms – deposit (25-30%) and balance on completion



Ex-tax total
Quote this price
Your take

Free calculator by CoreQuote — the quoting app for trades

(function(){ var SYM=’£’; function fmt(n){return SYM+Math.round(n).toLocaleString();} window.kwcShow=window.kwcShow||function(btn,id){ var wrap=btn.closest(‘.corequote-calculator’); wrap.querySelectorAll(‘button’).forEach(function(b){b.style.color=’#888′;b.style.borderBottom=’2px solid transparent’;}); btn.style.color=’#0D1F3C’;btn.style.borderBottom=’2px solid #F5C800′; [‘kwc-dayrate-pricing’,’kwc-margin-pricing’,’kwc-pricing-pricing’].forEach(function(i){var el=document.getElementById(i);if(el)el.style.display=’none’;}); var t=document.getElementById(id);if(t)t.style.display=’block’; }; window.kwcDR_pricing=function(){ var sal=parseFloat(document.getElementById(‘kwc-sal-pricing’).value)||0; var wks=parseFloat(document.getElementById(‘kwc-wk-pricing’).value)||46; var bil=parseFloat(document.getElementById(‘kwc-bil-pricing’).value)||75; var tax=parseFloat(document.getElementById(‘kwc-tax-pricing’).value)||28; var oh=parseFloat(document.getElementById(‘kwc-oh-pricing’).value)||0; var gross=sal/(1-tax/100);var total=gross+oh*12; var bdays=wks*5*(bil/100);if(bdays0?(profit/p*100):0; document.getElementById(‘kwc-mgcost-pricing’).textContent=fmt(cost); document.getElementById(‘kwc-mgpro-pricing’).textContent=fmt(profit); document.getElementById(‘kwc-mgpct-pricing’).textContent=pct.toFixed(1)+’%’; var v=document.getElementById(‘kwc-mgverdict-pricing’); if(pct>=30){v.style.color=’green’;v.textContent=’Healthy margin — above 30% is the target for a sustainable trades business.’;} else if(pct>=15){v.style.color=’#888′;v.textContent=’Acceptable but tight. Consider increasing your rate or materials markup.’;} else{v.style.color=’red’;v.textContent=’Thin or loss-making. You need to charge more or cut costs.’;} }; window.kwcJP_pricing=function(){ var h=parseFloat(document.getElementById(‘kwc-jph-pricing’).value)||0; var r=parseFloat(document.getElementById(‘kwc-jpr-pricing’).value)||0; var m=parseFloat(document.getElementById(‘kwc-jpm-pricing’).value)||0; var mk=parseFloat(document.getElementById(‘kwc-jpmk-pricing’).value)||0; var c=parseFloat(document.getElementById(‘kwc-jpc-pricing’).value)||0; var lab=h*r;var mc=m*(1+mk/100);var sub=(lab+mc)*(1+c/100); document.getElementById(‘kwc-jpex-pricing’).textContent=fmt(sub); document.getElementById(‘kwc-jptot-pricing’).textContent=fmt(sub); document.getElementById(‘kwc-jptak-pricing’).textContent=fmt(sub-m); }; kwcDR_pricing();kwcMG_pricing();kwcJP_pricing(); })();

Free Landscaper Quote Template (UK) — PDF
Print-ready A4 template with labour, materials and £VAT breakdown. Fill in and send.
Download free PDF

Frequently Asked Questions

How do I quote for a patio installation? Measure the area (m²). Specify the paving product. Calculate: excavation and disposal, sub-base (MOT Type 1 depth and quantity), sharp sand, paving slabs, and labour. Include edge restraints and any steps. Always include a provisional sum for unexpected ground conditions.

Should I take a deposit on landscaping work? Yes – 25-30% before ordering materials. For larger garden projects, a staged payment structure (25% deposit, 25% on materials delivery, 50% on completion) protects both parties.


CoreQuote makes landscaping project quotes fast and professional. Download free on Android — get CoreQuote on Google Play.

Related reading:

Want to quote faster? CoreQuote is a free quoting app built specifically for UK trades businesses — create professional quotes in seconds, get digital sign-off from customers, and convert to invoices with one tap. Try it free today.

Similar Posts